Digital Production Checklist System
Replace paper shopfloor clipboards with shift-scheduled digital checklists for machine start-up, changeover, 5S, and line checks with photo proof and instant fail alerts.
Sample System Screen · Shopfloor Production Checklist & Completion Board (Multi-Line Injection Moulding & Assembly Plant (Senai, Johor))
Problem → Solution → Result
Paper checklists get ticked late without catching faults
Printed start-up and 5S checklists sitting on machine clipboards are often batch-ticked at shift end, torn or oil-stained, and leave failed inspection items unseen until scrap accumulates.
- •Paper checklists ticked hurriedly at the end of a shift instead of at start-up
- •Failed items recorded in ink with zero escalation or supervisor follow-up
- •Damaged, lost, or illegible hardcopy sheets on busy lines
- •Hours of manual filing and sorting before ISO or customer audits
Shift-scheduled digital checklists with instant NG escalation
Operators open assigned checklists by line and shift on a tablet, input machine readings and photos, and submit for supervisor review. Any failed item triggers an immediate alert until closed.
- •Shift-Scheduled Start-Up, Changeover, 5S & Line Check Templates
- •Parameter Value Entry, Range Checks & Photo Evidence
- •On-Screen Supervisor Verification & Approval
- •Live Completion & Open NG Item Board by Line
Verified line readiness and zero paper filing
Confirm every machine passed its start-up checks before production starts.
- ✓Start-up and changeover checks completed on schedule before line run
- ✓Failed inspection points reach supervisors immediately instead of days later
- ✓Time-stamped operator records with attached photos ready for ISO audits
- ✓Eliminates clipboard printing, binder storage, and manual spreadsheet compiling
Key Capabilities & Technical Specs
Shopfloor Workflows & Capabilities
Built for daily use on Malaysian and Singaporean factory floors.
Build distinct checks for start-up, mould/line changeover, 5S, autonomous maintenance, and QC.
Assign due windows per machine and shift so missed checks trigger instant alerts.
Record temperatures, pressures, and visual photo proof inside every check item.
Give line leaders fast tablet sign-off over completed shift checks.
Route failed checklist items directly to maintenance or QA until resolved.
Monitor completion compliance and recurring failed items across every line.
Technical Specs & Plant Setup
Supported hardware, plant network connectivity, and output formats.
Start on one production line in 4 to 8 weeks.
Connect with XyncEdge on your factory LAN and scale into XyncCloud when ready.
Inquiry - Digital Production Checklist System